Fire stopping, fire compartmentation, fire door and survey projects completed by ALERON Fire Protection in schools, care homes, hotels, public venues and commercial buildings across the UK.
ALERON Fire Protection is a Kiwa IFC Certification certificated installer of passive fire protection (certificate IFCC 3108). Trading since 2010; ALERON Fire Protection Limited since 2015.
Schools, colleges and universities, worked around term time and occupied buildings.
Fire-rated batt and mastic barriers and sealed service penetrations at New College Swindon, achieving 30- and 60-minute fire resistance across the campus.
30- and 60-minute fire-rated barriers and sealed cable, pipe and tray penetrations at St Patrick's Academy, protecting stairwells and corridors.
ALERON installed 60-minute fire-rated batt and mastic barriers and sealed cable penetrations at The Open University, where substrates lacked fire resistance.
Fire-rated smoke barriers and sealed pipe, duct and cable penetrations on a third floor at the University of Oxford, restoring fire compartmentation.
ALERON installed and remediated single and double leaf fire doors at USP College's Palmer's Campus, restoring compartmentation in renovated buildings.
Single leaf fire doors fitted with hinges, closers, locks, signage and intumescent, smoke and drop-down seals at The College of Psychic Studies, London.
ALERON surveyed fire stopping across the Royal Academy of Music's historic London buildings, identifying unsealed penetrations and remedial actions.
Fire-rated batt and intumescent mastic seals around pipes, cables, steel and ductwork at Maltman's Green School, Gerrards Cross, labelled for traceability.
Care homes, respite and residential settings where residents stay in the building during works.
60-minute double batt and mastic barriers and sealed voids, cables, pipes and head-of-wall gaps at Mayflower Care Home, protecting residents and staff.
FD30 and FD60 fire door repairs at Maples Care Home: leaf-to-frame gap adjustments, new lippings, intumescent and smoke seals, hinges and ironmongery.
Photos of completed remedial fire stopping works by ALERON at Beauchamp Park, carried out to restore fire compartmentation and improve fire safety.
60-minute double batt and mastic barriers and sealed holes, voids, cables and pipes at Zetland Court care home, correcting poorly sealed plasterboard gaps.
ALERON installed plasterboard in the ceiling at Homelink Day Respite Centre, London, to stop fire spreading through service areas. Remedial works photos.
Fire door repairs at Royd Court, Mirfield: closer adjustments, leaf-to-frame gap corrections and hinge replacements to restore fire and smoke containment.
60-minute double batt and mastic barriers and sealed holes, voids, head-of-wall gaps, cables and pipes in block walls at College Gardens residential facility.
Live hotels, with rooms and corridors kept in use.
Single leaf fire doors installed at a Holiday Inn Express hotel, complete with hinges, closers, locks, signage and intumescent, smoke and drop-down seals.
Single leaf fire doors with closers, locks, signage and intumescent, smoke and drop-down seals installed at Hilton Hotel, Coventry, in a working hotel.
ALERON built a fire-rated ceiling and sealed fire damper and service penetrations at Radisson Red Heathrow to restore fire compartmentation in the hotel.
Theatres, museums, stadiums and attractions open to the public.
ALERON installed 30-minute fire-rated barriers and sealed vents, pipes, cables and conduits at YMCA Horsham, a busy community and leisure facility.
ALERON installed fire-rated batt and mastic barriers and sealed cable bunches and tray penetrations at the Science Museum, London, a busy public venue.
Fire-rated barriers and sealed service penetrations in the renovated areas of Coventry Stadium, restoring fire integrity in a major sports and events venue.
30- and 60-minute fire-rated barriers and sealed cable, lighting, sound and HVAC penetrations at the Royal Exchange Theatre, Manchester, a historic venue.
ALERON sealed cable, trunking and mechanical service penetrations at Warner Bros. Studio Tour London with tested, labelled firestopping in a live venue.
Offices, broadcast and showroom buildings.
ALERON installed fire-rated batt and mastic barriers at BBC Headquarters during refurbishment, achieving 30-minute fire resistance in a live building.
Fire stopping of pipework, cable tray and ductwork penetrations with batt, mastic and coated boards at Mercedes-Benz, Tongwell, a busy flagship site.